Sani
By Ibrahim Hassan-Wuyo
The Kaduna State Government has said it would complete the ongoing 63 road networks across the state within a stipulated time.
The Managing Director of Kaduna State Roads Agency (KADRA), Dr. Abdullahi Baba Ahmed, gave the assurance on Friday at a press conference held in Kaduna.
He said the roads totalling more than 700 kilometres were initiated not only to benefit communities now but also for generations to come.
“Governor Uba Sani’s administration is committed to addressing the needs of the rural poor, who have often felt marginalised and disconnected from the dividends of democracy.
” Many citizens are now jubilant as they witness tangible development in their communities, particularly through improved access roads, the installation of streetlights, and other vital infrastructural projects.
He emphasizes that Governor Sani’s administration recognizes that well-constructed roads are the backbone of economic activities, connecting farmers to markets, schools, and healthcare facilities.
” The achievements we celebrate thus far are not just about roads and bridges;
they represent our commitment to building a more connected, prosperous, and inclusive Kaduna State.”
He explained that the administration had initiated the construction of a 22.5km Asphaltic Road from Gwantu in Sanga Local Government through Kibam to Godogodo, linking over 65 farming communities including Jema’a Local Government Areas.
He added that the reconstruction/Upgrading of Asphaltic Access Roads within the Old Panteka Market, Kaduna State (Lemu, Enugu, Malam Madori Roads) was also ongoing.
“Reconstruction of a 6km asphaltic road from Rafin Guza to Hayin Nariya to Malalin Gabas to Kukumaki linking the ongoing construction at the KASU Permanent Site is already wearing a new shape.
“Construction of a 13km Access Road Connecting Turawa to Dinya through Da’a, Kurungupi, and Kadage in Soba Local Government Area, construction of a 5.8km Access Road from Gwaraji to Wusar; connecting Igabi and Kajuru Local Government Areas to facilitates movement between the two Local governments Areas,” He said.
” Construction of a 15km Access Road Connecting Kasuwar Magani to Wusar in Kajuru Local Government Area reconstruction and Upgrading of Ja Abdulkadir Asphaltic Road, Unguwan
Rimi, Kaduna, noting that the project was a testament to our commitment to urban development and infrastructure improvement.
Continuing,” Construction of a 5.525km Asphaltic Road from Airport Road to Tudun Biri Community was another project aimed to enhances connectivity for residents and businesses, making it easier for them to access the airport and other vital services.
“Completion of Abandoned PAN Drive to Kachia Road:This small but critical
section of the road was completed under Governor Uba Sani’s administration. It is
a vital connection for traveling to Abuja from the Northwest and Northeastern States, ensuring smoother transit and enhancing regional
connectivity.
” Construction of a 35km Access Road from Gadan Gayan through Gwaraji to
Kujama Junction:This expansive project links Igabi to Chikun Local Government
Areas, facilitating movement and trade between these local governments and
opening up new economic opportunities for communities along the route. It
connects more than 70 communities in their area.
He said that the administration also engages in the rehabilitation and repair of Critical Infrastructure, with a special focus on repairing collapsed culverts and retaining walls on key roads, including Abuja Road in Rigasa and College Road by Gwamna Road, stressing these repairs are essential for maintaining road safety and ensuring uninterrupted access for all users,” He stated.
Adding,” Reconstruction of a 14.8km Asphaltic Ring Access Road from Danbushiya Junction to Danhonou 2, connecting several communities in Millennium City, enhancing access to markets, schools, and healthcare facilities.
“Reconstruction of a 35.6km Road from Bagoma to Gagumi; connecting multiple communities in Birnin Gwari LGA and reconstruction of a 21.95km Asphaltic Road from Madauchi to Kafanchan which links Jema‘a Local Government to Zangon Kataf LGAs.
” Reconstruction of a 21.85km asphaltic road from Pambeguwa to Kauru linking Kubau and Kauru LGAs and finally, completion of Sultan—Surame Road, connecting Shehu Laminu Road in Ungwan Rimi.
The KADRA boss maintained that the massive infrastructural projects were not only enhancing connectivity but also curbing rural-urban migrants and stimulating economic activities in rural areas, leading to a robust harvest and facilitating easy transportation of farm produce to markets, and strengthening the local economy.” He concluded.
Disclaimer
Comments expressed here do not reflect the opinions of Vanguard newspapers or any employee thereof.