Electricity Generation Companies (GenCos) comprising gas-fired and hydro stations said they could not generate 3,568 megawatts of electricity on Wednesday due to the unavailability of gas.
This information was made known in a daily energy report by the Advisory Power Team, office of the Vice President, a copy of which was obtained by News Agency of Nigeria (NAN) in Abuja on Thursday.
The report also noted that 110 megawatts of electricity was not generated due to unavailability of transmission infrastructure during the period.
Similarly, it said that 603.3 megawatts of was not generated due to high frequency resulting from unavailability of distribution infrastructure.
ALSO READ: Six million electricity consumers on estimated billing — NERC
The report, however, said that the GenCos released an average of 4,149 MegaWatts/Hour of electricity into the national grid on Wednesday.
It said the electricity sent out by the GenCos was down by 226.51 megawatts from the 4,376 released on Tuesday.
- More News:
- COVID-19: Kano to close schools from Monday
- Monaco’s head of state Prince Albert II tests positive for coronavirus
- Coronavirus: President Buhari’s daughter on self-isolation after UK trip
- Family of 5 quarantined in Nasarawa over suspected cases of coronavirus
The report revealed that the power sector lost an estimated N2,055 billion on Wednesday due to insufficient gas supply, distribution, and transmission infrastructure.
On sector reform and activities, it said that the dominant constraint for Wednesday was unavailability of gas.
The report said the peak generation attained on Wednesday was 4, 640 megawatts.
[NAN]