Breaking News
Translate

Lagos Govt to shutdown Third Mainland bridge from Friday midnight

Kindly Share This Story:
3rd Mainland bridge
Mainland Bridge

The Lagos State Government has announced that there would be total closure of the third mainland bridge from midnight Friday to midnight Saturday.

The Commissioner for Transportation, Dr Frederic Oladeinde who made this known in a statement issued in Lagos on Wednesday, said   the bridge would be closed for 24 hours.

Oladeinde said  the closure would enable  contractors move the equipment used during the rehabilitation process of the bridge completely to allow both the Oworonshoki and Adeniji bound lanes open fully to traffic.

He said the closure was necessary,  haven  completed the replacement of the 12 expansion joints and to demobilise the superstructure of the bridge.

READ ALSO: COVID-19 infection in Lagos may top Africa’s official total

The commissioner, therefore, advised motorists from Ogudu, Alapere and Gbagada to use Ikorodu Road, Jibowu and Yaba as alternative routes.

“While Iyana Oworoshoki-bound traffic from Lagos-Island, Iddo, Oyingbo, Adekunle and Yaba are enjoined to use Herbert Macaulay Way, Jibowu and Ikorodu road as alternative routes,” he said.

Oladeinde assured that Traffic Management Personnel would be deployed along the affected routes to minimise and address any traffic impediments during the closure.

He commended the people of Lagos for their cooperation during the prolonged repair works of the bridge, assuring that it was now safe for use by all and sundry. (NAN)

Vanguard News Nigeria

Kindly Share This Story:
All rights reserved. This material and any other digital content on this platform may not be reproduced, published, broadcast, written or distributed in full or in part, without written permission from VANGUARD NEWS.

Disclaimer

Comments expressed here do not reflect the opinions of vanguard newspapers or any employee thereof.
Do NOT follow this link or you will be banned from the site!