$1.2bn Zungeru Hydro begins 700MW supply to National Grid – Power Minister
The 700 Megawatts capacity Zungeru Hydro Power plant which was constructed at the cost of $1.2 billion has being connected to the National Grid System, the Minister of Power, Engr Abubakar Aliyu has disclosed.