Acute gas shortage knocks out several power plants
…Over 3,000MW stranded By Obas Esiedesa Low pressure on the Escravos-Lagos Pipeline System, ELPS, has left several power plants without gas supply leaving about 3,000 mega watts of power stranded. The 439Km ELPS which was commissioned in 1989 is owned and operated by the Nigerian Gas Company, a subsidiary of the Nigerian National Petroleum Corporation, […]