More than 400 pipelines have been destroyed in Nigeria’s oil rich Niger Delta region in the last two years, the Lagos-based Vanguard newspaper reported on Monday.
Citing Joseph Dorgu, chairman of the Pipeline Professionals’ Association of Nigeria (PLAN), the report said the vandalism was caused by militants in the region.
He said one way the nation could consolidate on the peace brought about by amnesty was to allow all sections to demonstrate integrity and transparency.
According to him, the action of the militant group was triggered largely by the absence of integrity in the system.
He added that the government should engage the employable group in the region, suggesting dialogue at all times in conflict resolution.
Dorgu also called for a strong electoral process that would produce popular leadership at all times in the country as another way to avert tension in the region.
The Niger Delta is an unstable area where inter- ethnic clashes are commonplace. Access to oil revenue is the trigger for the violence. Over 300 foreigners have been seized in the Niger Delta since 2006. Almost all have been released unharmed after paying a ransom.
Attacks and bunkering on oil pipelines in the Niger Delta have cut Nigeria’s output by around a fifth in recent
years, helping push world oil prices to record highs since the beginning of 2006.
The unrest in the region has forced many international firms to flee the area. The government mobilized the Nigerian army and coast guard in an anti-banditry operation.
In June, the Nigerian government offered amnesty to gunmen in the oil rich Niger Delta region, urging them to lay down their weapons by Oct. 4.
Saipem to supply, operate FPSO for Aquila field
Saipem has been awarded a contract for the supply and operation of a FPSO vessel (Floating Production Storage and Offloading) worth approximately 1 billion euro (around US $1.5 billion).
The contract, awarded by Eni, encompasses the conversion of a wholly owned oil tanker into a FPSO vessel, for
which Saipem will provide the installation and the operation management. The FPSO vessel will have a storage capacity of 700,000 barrels and a production capacity of 12,000 barrels of oil per day. Production activities will start in the fourth quarter of 2011.
The contract, lasting 20 years, is divided in two phases. For the first 8 years, the FPSO will be employed for the exploitation of the Aquila field.
News
- Nigeria loses $10bn export opportunities annually – Agriculture Minister
- Boko Haram: Army recovers sect’s overseas military training videos
- N894m contract scam: Bankole gave contracts to ghost firms, says EFCC
- How to prevent Lassa fever outbreak, by Lagos govt
- Power privatisation to be completed Q3 – Nnaji
- Senate summons Okonjo-Iweala, Diezani, others over fuel scarcity
- SSS foils attempt to kidnap two Delta commissioners



